Lighting compliance and energy intelligence for NYC buildings.
LuxNet delivers field-verified lighting audits, LL88 compliance documentation, and retrofit planning for commercial properties — from survey to report to action.
| Area | Floor | Fixtures | LPD (W/sf) | Status |
|---|---|---|---|---|
| Main Lobby | 01 | 184 | 0.84 | OK |
| Parking Level B2 | B2 | 142 | 0.21 | OK |
| Mechanical Penthouse | 97 | 96 | 1.12 | REVIEW |
| Corridor — Floors 40–50 | 40–50 | 88 | 0.62 | OK |
Three things every report has to do.
Field-verified data, compliance-ready documentation, and retrofit intelligence your team can actually act on. Every engagement, every building.
Field-Verified Data
Every fixture counted, every control documented. Our survey teams capture complete lighting inventories with photos, condition assessments, and energy measurements — no desktop estimates.
Compliance-Ready Reports
LL88, LL132, LL134 — we know what the city requires. Our reports include light power density calculations, controls assessments, sub-metering reviews, and deficiency identification, ready for DOB filing.
Retrofit Intelligence
Baseline energy profiles, LED conversion projections, and controls upgrade modeling — with cost savings and payback analysis your team can act on.
Is your building covered?
Cross-reference your address or BBL against NYC's covered-buildings list and see which local laws apply — in under 10 seconds. No sign-up to see results.
Check your building
Enter a 10-digit BBL or a property address in NYC. We'll cross-reference the city's covered-buildings list and show which laws apply.
Don't know your BBL? .
From scoping call to filed report.
A four-step workflow built around your compliance deadline. Most projects run on a 4–6 week cycle from kickoff to delivery.
Three tiers. Choose the depth your project needs.
Fixed-price proposals based on property type, square footage, and survey tier — no hourly billing, no surprise charges.
Essential
Existing conditions documentation. Best for buildings that need a current-state baseline or simple record of existing lighting.
- Fixture schedule by area
- Photo documentation
- Condition assessment
- Area inventory summary
Compliance
Detailed compliance analysis for LL88 and related laws. Controls review, power density calcs, sub-metering, and deficiency identification.
- Everything in Essential
- LL88 compliance findings
- Light power density calculations
- Controls strategy documentation
- Energy & savings projections
Project+
Full project-development package for buildings planning active retrofits. Bid-ready specifications and budget support included.
- Everything in Compliance
- Controls upgrade strategy
- Budget-grade cost estimates
- Product specifications
- Installation planning support
Tailor the scope. Add what your project needs.
Pull in additional documentation, project support, or logistics services to fit unusual buildings, occupied spaces, or custom deliverables.
Compliance & Documentation
- LL88 Compliance MemoFormal compliance narrative for DOB filing
- Floorplan / Zoning MarkupAnnotated drawings of surveyed areas
- Utility / Incentive Support DataDocumentation for rebate applications
Project Support
- Proposal-Ready Budgeting PackageContractor-ready cost breakdowns
- Preliminary BOM / Controls ScheduleBill of materials for procurement
- Expanded Photo / Report PackageAdditional documentation depth
Logistics
- After-Hours / Night SurveyFor occupied or 24/7 buildings
- Return VisitFollow-up for missed or inaccessible areas
- Multi-Building PortfolioPricing for portfolios & campuses
- Hard-Access SiteBuildings requiring special coordination
Pricing is based on property type, square footage, and survey tier. We provide fixed-price proposals — no hourly billing, no surprise charges.
Request a ProposalProperty managers, owners, and engineering firms across Manhattan.
From Class A office towers to mixed-use residential, parking structures, and multi-building portfolios — LuxNet works at the depth your asset class requires.
// Built on 15+ years of NYC lighting consulting
Common questions.
The questions board members and property managers ask before every engagement. If yours isn't here, drop us a note.
How long does a survey take?
Do you need access to occupied units or tenant spaces?
What does a survey cost?
Are you licensed and insured?
What happens after the report is delivered?
Can you help with the actual retrofit, or just the survey?
What's the difference between LL88 and LL97?
“LuxNet's survey gave our board the numbers we needed to plan our LL88 retrofit without guessing. The report was clear, the timeline was honest, and the documentation made the filing painless.”
Your building has a compliance deadline. We can help you meet it.
Get a scoping call on the books. We'll assess your property, recommend the right survey tier, and deliver a proposal within 48 hours.
Request a Proposal