Case study · Networked lighting controls
Corridors and garage on one control network
92 units in the Bronx — 38,800 sq ft of corridor and garage, already LED, lit 8,760 hours a year with no controls.
Multifamily · Bronx, NY · 15 zones
DetailFigure 2 — A resident lifts floor 9 to full; the stack holds 20% and settles back when the corridor empties.
Per-floor corridor zoning
Twelve zones, one per floor. A resident stepping off the elevator lifts their own floor and nothing else.
Schedule
Zone by zone
Fifteen zones. Strategy set per space.
| Zone | Space | Hrs/yr | Control | Why |
|---|---|---|---|---|
| Z-1 – Z-12 | Corridors, one per floor | 8,760 | 20% standby, occupancy to full | Occupied minutes at a time |
| Z-13 – Z-15 | Garage, three structural bays | 8,760 | 5% standby, adjacent-bay ramp | Parked cars aren't occupancy |
Commissioned
Sequence of operations
How each zone is programmed.
| Space | Sequence | Note |
|---|---|---|
| Corridors ×12 | 20% standby · occupancy to full | One floor lifts at a time |
| Garage ×3 | 5% standby · adjacent-bay ramp | Brightens ahead of the driver |
| All zones | 24/7 occupancy-driven · no schedule | Standby never drops out |
Calculated
Annual impact
24,020kWh avoided / yr
$6,005saved / yr at $0.25/kWh
9.4 t
CO₂ avoided / yr
≈1,060
gallons of gasoline equivalent
≈160
tree seedlings grown 10 years
Start with a feasibility memo
A savings range and a scope for your building, before you commit.
Get a feasibility memo